Fortescue Zero R&D Manufacturing Facility

Structural Engineering
Industrial

Structural Engineering Design

JPP provided structural engineering design for the alterations to Fortescue Zero’s R&D and manufacturing facility in Banbury.

Our expertise helped adapt the existing structure to enable their pioneering work in heavy industry decarbonisation.

At this facility, Fortescue Zero is developing and shipping cutting-edge Power Systems for the Liebherr T264 Mine Haul truck—an advanced electric system designed to replace diesel power and drive a more sustainable future.

We’re proud to support projects that push the boundaries of innovation and sustainabiliy.

Discuss Your Project

Gallery

Structural Engineering
Industrial

Forterra Desford Brickworks Facility

Structural Engineering
Residential

20 Panorama Road

Structural Engineering
Leisure

Cranfield Community Centre