Cropredy Marina
Levels design and earthworks modelling
JPP assisted Greenfisher Contracting with the civil engineering design on their earthworks scheme to extend Cropredy Marina and add up to 100 new berths within a new basin created off the existing marina.
JPP’s works extended to:
Levels design and earthworks modelling for the new car park and access track
Investigation works to establish the outfall to an existing ditch crossing the proposed basin and a design for the ditch diversion and subsequent culvert around the basin
Managing the Section 23 application process with the LLFA up to approval





